Wednesday, July 6, 2011

ICP-LESSON 1

things that u must make sure before running ICP,
  1. check gas
  2. tore samples
  3. check tubing
To warm up ICP:
  1. Switch on plug of ICP, PC, Chiller
  2. Check gas, open the gas tank, both on the gas tank & on the wall to green color.
  3. Check air compressor (push the red button to the back, open the blue screw on the right and 1 more screw on the bottom. Shake that air compressor, just to make sure, water flows out coz condensation occurs.
  4. Re-tighten the screw back and pull the red button to the front.
  5. On ICP generator button, its on the right side.
  6. Open the winlab 32
  7. Click F11
  8. Lock the yellow and white tube
  9. To wet tubing, click on Plasma control
  10. On pump
  11. After no bubble seen, off the pump
  12. On plasma, wait to 5 mins
  13. stabilize, minimize window for plasma control
  14. Click Auto, cancel -Print log during analyses
  15. Result data set name
  16. open, re-name; name and description
  17. click analyze
  18. check back with the Location and Samples ID type previously
  19. If OK, click analyze ALL
  20. go to Spectra to check for calibration

No comments:

Post a Comment

LinkWithin

Related Posts Plugin for WordPress, Blogger...