- check gas
- tore samples
- check tubing
To warm up ICP:
- Switch on plug of ICP, PC, Chiller
- Check gas, open the gas tank, both on the gas tank & on the wall to green color.
- Check air compressor (push the red button to the back, open the blue screw on the right and 1 more screw on the bottom. Shake that air compressor, just to make sure, water flows out coz condensation occurs.
- Re-tighten the screw back and pull the red button to the front.
- On ICP generator button, its on the right side.
- Open the winlab 32
- Click F11
- Lock the yellow and white tube
- To wet tubing, click on Plasma control
- On pump
- After no bubble seen, off the pump
- On plasma, wait to 5 mins
- stabilize, minimize window for plasma control
- Click Auto, cancel -Print log during analyses
- Result data set name
- open, re-name; name and description
- click analyze
- check back with the Location and Samples ID type previously
- If OK, click analyze ALL
- go to Spectra to check for calibration
No comments:
Post a Comment